PROJECT: Correctional Complex Feasibility Study Review

A major supplier of facility building energy management systems requested a review of their Energy Savings Performance contract technical work scope. The originally proposed work scope include extensive modifications to the existing steam energy production plant, hot water heating system, building space heating systems, laundry steam usage, and kitchen food heating kettles.

Engineering services was responsible for completing a full feasibility study on the proposed energy system modifications. This work included assessments of existing equipment, heat transfer and thermodynamic engineering calculations of the existing versus proposed changes, and the production of a fully documented technical report.

RESULTS


• Conducted online functional testing of the site's boiler operation to record actual energy usage during peak demand loads of a cold morning with existing boilers operating at 15 psig. Concluded with devices valved in/out existing boiler under capacity.