Whether your facility is a new installation, is in need of refurbishment or requires maintenance, the Laminar team can provide a solution.

The team brings their unique combination of experience, creative problem solving and professional business and project management capabilities to your project.

For additional detilas about a specific project or facility, please contact us at 1-888-705-0072 or email .

Solutions

Process Design Modifications

Create and evaluate the best process design modification to overcome a specific client challenge. Document in a formal design proposal, implement, test, and commission.

Control System Design Engineer

Conduct all phases from concept thru design and complete responsibilities with successful commissioning of the system.

PROJECT: Gas Turbine Refurbishment & Turbine/HRSG Controls Upgrade Project
• Completed a conversion of the Solar Turbine Centaur 40 hydraulic starter system to a Variable Frequency Drive (VFD). Provided the electrical design sketches, supervised construction, determined and conducted VFD programming config's, & S/U.

PROJECT: Simultaneous Restoration of Two Biomass Power Plants
• Created and formally documented a proposed process and control logic upgrade for the boiler master, fuel flow, air flue, gas recirculation, and induced draft fan control logic. This new design included improved process monitoring and control philosophy.

Mechanical Engineer

Provide mechanical engineering services on client's processes and systems.

PROJECT: Combined Cycle Power Plant Steam Drain System Improvement Project
• Completed a computer modeled simulation of the steam drain multi-phase steam flow conditions. Used this computer model to determine the new design modifications to eliminate flow conditions above sonic velocities.

PROJECT: Gas Compressor Control Logic Upgrade Project
• Applied Ariel's gas compressor software to model the client's system and operating conditions to determine necessity to relocate gas cooler and to determine combination of loader valves/operating pressure to trip based on rod loads.

PROJECT: Hydro Power Plant Refurbishment & Upgrade Project
• Built a software model of the site water hydraulics to determine the flow characteristics of aux water supplies when a large (108" dia) bypass valve is placed in operation. This model justified the need to maintain backup pump capacity to the hatchery.